February 2014

PSA Sines, concessionaire of the Sines Container Terminal (Terminal XXI), started the terminal expansion project, which will increase its capacity to 1.1 million TEU to 1.7 million TEU per year.

The construction of 216 m of quay based on reinforced concrete piles with 1.30metros in diameter and 25 meters high, implies 10 ha advance in landfills in the sea about 20 meters high.

Inert required to work are extracted from APS quarries at a rate of over 1200 trucks per day.

In this project, EGAPI developed for Mota-Engil AGGREGATES an innovative “truck expedition control”, "non-stop", in order to optimize the inert transport operation between the quarry and the area work of the pier expansion.

The weighing control system in road weighbridge, performs quality control and weighing the inert, non-stop, using an automatic license plate identification system (LPR - License Plate Recognition).

 